This is the situation as of Monday night at 7:30: The lights all work (except for one 4-way switch that needs to be replace). Rest of power not yet working. There are 5 additional circuits in the this new kitchen! Note the pendant lights over the island!
Most of the backspash tile is in, but we ran out of tile, and couldn't get more until this morning. Here is the mosaic that Lynn designed! Not grouted yet, but still looks stunning!
Hopefully today the stove and dish washer will get installed, and the tile finished.
0 comments:
Post a Comment