It's done!!!!!


Here is the finished kitchen from the living room! [Click on the image to get a larger view.]

(Actually, we're still waiting for a piece of trim from the cabinet mfg, and the final building inspection won't happen until next week.)


Here's the view from the left, coming up the stairs. Note the pillar.


And here is the view of the right. We haven't figured out what chairs to put around the island and desk areas, and we're now having the living room/hallway lightly sanded and re-poly-ed next week, but Lynnie is busy cleaning the inside of the frig and the outside of everything so we can start to put all the kitchen stuff back again.

Tuesday, October 6, 2009

Tuesday


This is the situation as of Monday night at 7:30: The lights all work (except for one 4-way switch that needs to be replace). Rest of power not yet working. There are 5 additional circuits in the this new kitchen! Note the pendant lights over the island!

Faucet and drain now work in the sink, and the garbage disposal is in but not working.

Most of the backspash tile is in, but we ran out of tile, and couldn't get more until this morning. Here is the mosaic that Lynn designed! Not grouted yet, but still looks stunning!

Under cabinet xenon lights are on dimmers and all are working fine.

Hopefully today the stove and dish washer will get installed, and the tile finished.

Monday, October 5, 2009

Monday morning


Well, the baby-sitting has prevented us from updating for a few days. Here is the granite countertops that were installed last Friday. Really starting to come together!

Tuesday, September 29, 2009

Tuesday, 9/29/09

Today, a lot of work got done, though much of it is not visible. In fact John the electrician complained that much of his work goes un-noticed and unappreciated, so here is some of what he did today:Most all the electrical is finished. What remains is connecting the wires to the service panels, which is scheduled for Monday. Hopefully the doorbell and telephone will one again work at this time.


The appliances came yesterday, and are awaiting the plumber (Monday) to install the gas line to the stove, and water lines to the dish washer and refrigerator (above). (The frig currently has a plastic wrap on it, and it will be jet black when unwrapped.) The frig is in it's place but will eventually be pushed back, lining up with the cabinet on the left. The ceilings in the living room and kitchen were painted today, as well as the new living room walls. The dark red kitchen paint will be applied tomorrow, which should make the whole room pop! The wood floor adjacent to the kitchen will also be vanished tomorrow.

Granite is scheduled to be installed on Monday, and the exhaust fan connected. Minor problem appeared yesterday: Eric was cutting a hole in the wall for the exhaust fan, when he realized the external light which John had just installed, is right in the path of the fan.

We did manage to sell our old frig on Criag's list, and the purchaser was supposed to come this afternoon to pick it up. Unfortunately, there was no one here to help, so he rescheduled for Saturday. We told him to call ahead, to be sure we're there. (Baby-sitting this week-end).

Saturday, September 26, 2009




The floor tile is now in and grouted, and all the baseboard installed. We've managed to pick paint for the kitchen (Spanish Red), and approved the granite pattern layouts this morning. Hopefully the granite will be installed next week. The electrician was by on Friday, and installed most of the outlets in the kitchen. He'll be here all of next week: lots of electrical stuff to do.

Wednesday, September 23, 2009

Tile day


Good news today: Eric the contractor picked up the floor tile yesterday, and installed it all today! Tomorrow comes the grouting. The island and cabinets still need baseboards. In other news, we put our frig up on Craig's list last night, and in a half hour it was sold! Fellow came over this evening and gave us the cash, and he'll be back on Tuesday to pick it up. Monday the appliances will be delivered and the frig moved to the garage.

Lynn tried to heat up some leftovers in the microwave this evening, and the thing blew! Think it knew it was destined for the junk yard? I went up into the attic and brought down Ross's old orange cube, which we will make use of until our new one gets delivered and installed.

Monday, September 21, 2009

Monday, Monday!

The cabinets are mostly in now. Here is the refrigerator side (note the glass door in the corner cabinet:
Here is where the exhaust fan is going
and here is the bead board for the front of the island:

This is the right side of the kitchen. You can start to see the little desk area in the corner:And here is the other side of that corner, again with the (bubbly) glass doors.